Redmaids School
Contractor: Rydon
Package value: £500k
Date: 2017

Brief:
Works to be done for Redmaids Sixth Form, including a site strip, foundations (to be dug into rock), large floor slabs with a power float, initial drainage to include large attenuation tanks. The works would then follow on to complete further drainage services, along side the hard and soft landscaping; this included the construction and implementation if large concrete steps.
Successes:
This site was completed under strict timeframes, allowing for a continuous flow of work, which allowed us to work as efficiently as possible. The Sixth Form was opened ready for the new intake of A-Level students in September 2017.