Redmaids School
Brief:
Works to be done for Redmaids Sixth Form, including a site strip, foundations (to be dug into rock), large floor slabs with a power float, initial drainage to include large attenuation tanks. The works would then follow on to complete further drainage services, along side the hard and soft landscaping; this included the construction and implementation if large concrete steps.
Successes:
This site was completed under strict timeframes, allowing for a continuous flow of work, which allowed us to work as efficiently as possible. The Sixth Form was opened ready for the new intake of A-Level students in September 2017.
Contractor: Rydon
Package value: £500k
Monsdale Close
Contractor: Kier Living
Package value: £500k
Brief:
New build multi-unit housing site. Cut and fill operation to minimise spoil being removed from the site. Concrete footings, drainage and services and then hard landscaping incl. SUDS.
Successes:
One of the many new housing projects we have secured in the last 12 months.
Hatherley Manor
Contractor: Dribuild
Package value: £450k
Brief:
The construction of a new spa for an existing hotel, comprising of a full groundworks remit and the construction of a new swimming pool. Throughout the entirety of the project, the hotel must remain open. The works must ensure disruption to the guests is kept to an absolute minimum, due to the importance of future events booked.
Successes:
With all constructions adhering to time predictions, the Hatherley Manor Hotel remains fully functioning and thriving for the wide array of events in the coming months. Communication with management has been consistent and clear, allowing for a strong business relationship to form. All weddings booked during the construction period were fulfilled with no issues.
Hatherley Manor Spa Build - Foundations
Continuation of Foundation work
Garden Work
Walled Garden
Structure and Scaffolds